Реферат: Project Failure Essay Research Paper Total Quality
Methods for changes or modifications in the plan as the project
proceeds.
The quality plan should focus on providing action to prevent
profits leaking away through waste. If the quality management system does
not achieve this, then there is something wrong with the plan and it has
been set up or operated not with the principle. The whole approach should
be methodical, systematic and designed to function irrespective of changes
in management or personnel.
Control
The task of inspection or checking is taken by many to be the
passive one of sorting out the good from the bad, when it should be an
active device to prevent errors, defects, or nonconformance. In human
control it requires more care because it is frequently found that every
item, every word, every number, or every element of service is examined in
an attempt to stop errors or defects reaching or being seen by the customer.
Any control system based on detection of poor quality by poor
quality by postproduction inspection is unreliable, costly, wasteful, and
uneconomical. The measurement of inputs, outputs, and processes themselves
is a vital component of Total Quality Management.
Numbers and measurements are necessary for the processes to be
known. If inputs and the outputs can be measured and expressed in numbers,
then something is known about the process, and control is possible. The
first stage in using measurement as part of process control is to identify
precisely the activities, materials, equipment, etc., which will be
measured.
The size of measurement task must be managed so that a reasonable
parameter can be obtained. For example, some companies measure the
supplier performance or the growth rate of the company. The presentation of
this data is as important as getting the data because if you do not know